Gospel | Mixtape | Freebeat | Funny Meme | Live Scores |


CONTACT US   |   ADVERTISE WITH US  |   PROMOTE

       

Gossipspice Exchange

Music

Rema – Bounce Artwork Breakdown

Posted by on March 24, 2021 0

Rema – Bounce Artwork Breakdown

Download Rema – Bounce Artwork Breakdown Mp3 Download

Jonzing and Mavin’s golden boy, Rema shared with us the breakdown of Bounce Artwork. Analyzed in Detail, The design of his new buzzing hit song which was produced by Don Jazzy.

Following the amazing reception of my chart-topping single, Bounce, in this video, I sit down to explain the meaning of the song’s artwork. Designed by Willysart, shot by Mavin Films” – Rema

Every single entity on the artwork aside the Bear and lady is Rema, he shares the identity of all the Remas in the Bounce artwork. On the Artwork there is the; ‘Woman Video‘ Remmyboy, ‘Ailen‘ Remmyboy, ‘Beamer/Rainbow‘ Remmyboy, ‘Bad Commando‘ Remmyboy, ‘Ginger Me‘ RemBoy and more.

Also the Bear signifies Don Jazzy and the Lady on skull-face signifies Evil (Death).

Watch the video below to get the full Artwork Breakdown


What do you think about this song?

We want to hear from you all.

Drop your comments

Upload your Song

.

RECOMMENDED SONGS FOR YOU 👇

9ice – Aranbada Mr Eazi – Love For You Harmonize – Anajikosha Idowest – Mafia Tension Ft. Bella Shmurda Medikal – The Professor Jaysynths – Nobody ft. Jeff Akoh & Kuami Eugene Roque – Space House Lavaud – Oh My ft. Reekado Banks Ayra Starr – Sare LKT – Aya Wa Ni

READ ALSO 👇

No Comments Yet Drop a Comment

Drop your Comment



Go Back To The Top